Concept artwork: Storm-lit city seen from a futuristic atmospheric observation chamber.
Weatherhill Score

Know your
weather readiness.

One score. Five pillars. The evidence and actions behind every point. See where essential services are prepared—and where the gaps remain.

READINESS INDEX · EVIDENCE FIRST
READINESS / EXAMPLE 001
71READINESS / 100
30Controls05Pillars100%Coverage
Critical gaps remain open

Synthetic example · not a facility rating

AI-GENERATED CONCEPT ART · NO DEPLOYMENT SHOWN

The decision before the storm

Your facility’s readiness.
In one inspectable number.

What can keep running? What has been tested? What still depends on an assumption?

Weatherhill Score turns a defined assessment into a 0–100 readiness index, five pillar scores and a visible action list. Start with the site, its essential function and the evidence. Keep weather exposure alongside the score.

A readiness index is not a probability of avoiding damage. The current pilot uses a fixed general-facility profile and requires qualified review before a customer rating.

How it works

From a site assessment
to a decision you can defend.

Every point follows the published rubric. Every gap stays in the record.

01

Assess

Define the site and essential service. Review records, inspections and performance tests.

02

Score

Assess 30 controls across five weighted pillars. Missing evidence stays unknown.

03

Flag

Keep absent, partial and demonstrated capabilities visible. Critical gaps never disappear into an average.

04

Act

Assign the next action, owner and due date. Reassess as evidence and capabilities change.

The five pillars

See what moves the score.

Fixed pilot weights. Six controls per pillar. An evidence trail behind each assessment.

The scorecard

The number. The gaps.
The next move.

Switch between two invented records. Readiness changes; the example’s fog exposure stays the same.

01 / UNDERSTAND

Start with the evidence.

A reviewed failure counts as evidence. An unanswered question does not. Coverage tells you how much of the assessment is supported.

What counts as evidence ↗
EXPOSURE / HELD CONSTANT72 / 8,000 hours

Invented low-visibility observations. Historical frequency, not a forecast.

WH / READINESSPROFILE 01 · PILOT
WEATHERHILL SCORE

Example facility

Critical gaps open

Provisional readiness

Detection & decisions15% weight
83
100% evidence coverage
Physical protection25% weight
63
100% evidence coverage
Continuity & dependencies25% weight
67
100% evidence coverage
Response & people20% weight
83
100% evidence coverage
Recovery & improvement15% weight
63
100% evidence coverage
Evidence coverage 100%Critical 4 open / 0 unknown

SYNTHETIC EXAMPLE · INVENTED EVIDENCE

Baseline example. Power continuity is known absent or failed.

02 / TAKE ACTION

A high score cannot hide a critical gap.

The score and control status answer different questions. Review both before deciding what to fund, test or repair.

Power continuityFlag
Alert deliveryWatch
Service requirementsClear
Open the full assessment ↗
Read the signals

Three signals. No hidden gaps.

Status belongs to the individual control. It is never inferred from the headline number.

Clear

Demonstrated

Current evidence supports level 4 and its acceptance criterion.

Watch

Work remains

Current evidence supports levels 1–3. Full demonstration remains open.

Flag

Known gap

Reviewed evidence supports an absent or failed capability: level 0.

Unknown is a separate state. Missing, expired or contradictory evidence is unassessed. The headline score stays withheld until the evidence gates are met. “Clear” applies only to the stated control criterion; it does not certify a facility as safe.

What would your facility score?

Start with a site, an essential service and the decision you need to make. We will define the scope and evidence required.

Scope your assessment

Search weatherhill

Search papers, tools and the project.