Know the gaps.
Build the record.

A functioning pilot assessment: evidence, exposure, critical findings and exportable next actions. Your entries remain in this browser unless you export them.

Readiness · Measurement · Evidence

AI-GENERATED CONCEPT ART · NO DEPLOYMENT SHOWN

Pilot workbench. User-entered evidence is not independently verified. The fixed 30-control profile requires qualified applicability review before a customer rating. This tool has no live hazard feeds, evidence uploads or connected Exposure Watch synchronization.

The facility and scope

Loading an example replaces unsaved entries. Export or save first if needed. Sector is context only in this pilot; it does not change the fixed profile or qualify a rating for navigation, traffic control or grid operation. All controls start unknown. Dates and criteria are supplied by the reviewer.

Detection and decisions · 15%

D1 · Facility and asset locations

Confirm the site boundary, critical asset locations, coordinate uncertainty and accountable site owner.

Level 4 can use a suitable document review; acceptance criteria still apply.

Unknown

D2 · Material hazards and thresholdsCritical

Approve a hazard register linking each material hazard to an essential function, a defined trigger and its decision owner.

Level 4 can use a suitable document review; acceptance criteria still apply.

Unknown

D3 · Observation and forecast coverage

Document source, geographic coverage, observation time, valid period, missing-feed behavior and known representativeness limits.

Level 4 can use a suitable document review; acceptance criteria still apply.

Unknown

D4 · Alert delivery and acknowledgmentCritical

Exercise the selected alert route through the responsible recipient, acknowledgment and escalation path; retain timestamps.

Level 4 requires a performance test.

Unknown

D5 · Local measurement fitness

Where local sensors are required, document siting, calibration, units, maintenance and comparison with the agreed reference.

Level 4 requires a performance test.

Unknown

D6 · Information fallback

Demonstrate how the responsible team obtains usable information when the normal data or communications path fails.

Level 4 requires a performance test.

Unknown

Physical protection · 25%

P1 · Envelope, wind and hail protection

Obtain a qualified review of the relevant roof/envelope assemblies, openings, attachments and condition; document closure of material defects.

Level 4 can use a suitable document review; acceptance criteria still apply.

Unknown

P2 · Flood and drainage protection

Review relevant elevations, entry routes and drainage; demonstrate any deployable barrier against the site-approved acceptance criterion.

Level 4 requires a performance test.

Unknown

P3 · Wildfire and ember protection

Document qualified review of relevant vegetation, vulnerable openings and ember exposure; verify assigned maintenance completion.

Level 4 can use a suitable document review; acceptance criteria still apply.

Unknown

P4 · Heat and freeze protection

Define equipment and occupied-space operating limits; demonstrate the relevant protection capability under an approved test.

Level 4 requires a performance test.

Unknown

P5 · Smoke and air handling

Document intake controls, filtration and maintenance; test the material smoke/air-handling requirement against the approved criterion.

Level 4 requires a performance test.

Unknown

P6 · Asset protection inspections

Maintain current inspection evidence for essential equipment and verify closure of deficiencies that affect required function.

Level 4 can use a suitable document review; acceptance criteria still apply.

Unknown

Continuity and dependencies · 25%

C1 · Critical service requirementsCritical

Approve minimum service levels, critical load/demand, tolerated interruption and recovery targets, with units and responsible owners.

Level 4 can use a suitable document review; acceptance criteria still apply.

Unknown

C2 · Power continuityCritical

Demonstrate the approved critical load and transfer behavior; substantiate usable fuel, runtime assumptions and credible resupply.

Level 4 requires a performance test.

Unknown

C3 · Water and cooling continuityCritical

Demonstrate required water quality/volume and cooling capability for the defined critical demand and interruption duration.

Level 4 requires a performance test.

Unknown

C4 · Communications and systems

Test failover and recovery for the essential communications and operating records; identify any shared failure path.

Level 4 requires a performance test.

Unknown

C5 · Access, staffing and supply

Verify feasible alternate access, staff coverage and essential supplies against the selected scenario and required duration.

Level 4 can use a suitable document review; acceptance criteria still apply.

Unknown

C6 · Common failure modes

Review shared routes, substations, flood zones, carriers and suppliers; document how common-cause failures are handled.

Level 4 can use a suitable document review; acceptance criteria still apply.

Unknown

Response and people · 20%

A1 · Ownership and authorityCritical

Document current decision authority, delegated roles and coverage outside business hours; confirm role acceptance.

Level 4 can use a suitable document review; acceptance criteria still apply.

Unknown

A2 · Hazard response procedures

Approve site-specific actions linked to defined triggers, safe working requirements, decision owners and fallback arrangements.

Level 4 can use a suitable document review; acceptance criteria still apply.

Unknown

A3 · Training and exercisesCritical

Exercise relevant roles and scenarios, retain findings and verify that material performance gaps have assigned corrective action.

Level 4 requires a performance test.

Unknown

A4 · Occupant and worker needs

Review accessibility, mobility, language and site-specific worker needs with responsible personnel and the relevant procedures.

Level 4 can use a suitable document review; acceptance criteria still apply.

Unknown

A5 · Partner coordination

Confirm current interfaces with utilities, emergency management, contractors and nearby services, including their scope limits.

Level 4 can use a suitable document review; acceptance criteria still apply.

Unknown

A6 · Action records and handover

Demonstrate a timestamped decision, acknowledgment, escalation and shift handover record through a relevant exercise.

Level 4 requires a performance test.

Unknown

Recovery and improvement · 15%

G1 · Restoration sequence

Approve restoration priorities linked to service targets, inspection needs, dependencies and responsible decision owners.

Level 4 can use a suitable document review; acceptance criteria still apply.

Unknown

G2 · Repair and supply arrangements

Verify contractor availability assumptions, critical spares, lead times and access under the selected regional disruption.

Level 4 can use a suitable document review; acceptance criteria still apply.

Unknown

G3 · Records and system recovery

Demonstrate restoration of essential operating records and systems within the approved scope and recovery objective.

Level 4 requires a performance test.

Unknown

G4 · Restart assessment

Approve qualified inspection and acceptance steps before affected functions resume; identify the authorized release decision.

Level 4 can use a suitable document review; acceptance criteria still apply.

Unknown

G5 · Learning and corrective action

Retain exercise/event findings, assigned owners and due dates; verify closure with evidence appropriate to the deficiency.

Level 4 can use a suitable document review; acceptance criteria still apply.

Unknown

G6 · Resources and maintenance

Confirm funded maintenance, review ownership, expiring-evidence checks and resources for the critical resilience measures.

Level 4 can use a suitable document review; acceptance criteria still apply.

Unknown

Exposure is a separate record

Keep the source’s definition. Supply a threshold, period, geography and limitation. Leave unsupported likelihood unknown; a county percentile is not a facility probability.

Flood and heavy rain
Fog and visibility
Hail
Wind
Heat and freeze
Wildfire and smoke
Power, water and access

Working report

Search weatherhill